Human In The Loop
The expert remains the signatory.
Draft, reviewed, approved. Three roles, one accountability chain traced end to end.
Video: HITL validation from Draft to Approved
Draft
The operator produces. The system attaches the Run Receipt. Nothing circulates without a file.
Reviewed
The reviewer confronts the result with the evidence. They can send it back. They cannot approve blindly. Their feedback is timestamped and stored with the validation.
Approved
The approver signs. Identity, timestamp and file close the chain.
HITL approval signature
In practice
01 / 04
Produce
The draft is born with its file. No orphan deliverable.
See NEXA on your process.
A framing call to industrialize the committee your teams already run.